TopPodcast.com
Menu
  • Home
  • Top Charts
  • Top Networks
  • Top Apps
  • Top Independents
  • Top Podfluencers
  • Top Picks
    • Top Business Podcasts
    • Top True Crime Podcasts
    • Top Finance Podcasts
    • Top Comedy Podcasts
    • Top Music Podcasts
    • Top Womens Podcasts
    • Top Kids Podcasts
    • Top Sports Podcasts
    • Top News Podcasts
    • Top Tech Podcasts
    • Top Crypto Podcasts
    • Top Entrepreneurial Podcasts
    • Top Fantasy Sports Podcasts
    • Top Political Podcasts
    • Top Science Podcasts
    • Top Self Help Podcasts
    • Top Sports Betting Podcasts
    • Top Stocks Podcasts
  • Podcast News
  • About Us
  • Podcast Advertising
  • Contact
Not in our directory?
Add Show Here
Podcast Equipment
Center

toppodcastlogoOur TOPPODCAST Picks

  • Comedy
  • Crypto
  • Sports
  • News
  • Politics
  • True Crime
  • Business
  • Finance

Follow Us

toppodcastlogoStay Connected

    View Top 200 Chart
    Back to Rankings Page
    Government

    Santa Cruz County Transit and Transportation Agency Meetings – Audio Tracks

    Attending these meetings in person is very time consuming. They are long and there is often quite a bit of administrative business done. Not many people have the time to do it. And, even if you do, it is not a very efficient use of time.

    But the meetings are important. They are the best way to keep track of what the agencies are up to. These podcasts make access to that content very simple and efficient.

    I edit the podcasts to break the meetings into short, topical episodes. You can listen to the episodes that cover topics that matter to you. The cool thing about doing that with a podcast is that you can listen whenever and wherever you can.

    The podcasts are made from community tv.org ‘s video feed of the meetings. Thanks go to them for providing those. You can see the full videos on their website.

    I’ve started adding some episodes that cover the supporting documents for the meetings. Those can be very useful. I am using text to audio conversions to convert them to an audio format.

    I’m not editing the content of the podcasts. It is extracted directly from the video of the meetings. I am editing out the agency’s administrative business, and I am not including public comments. Both of those are available in the original video.

    There are some presentations that depend on a Power point presentation or slides. I make videos of those and post them on YouTube.

    Community Television of Santa Cruz County (CTV) videos of local agency meetings are here:

    https://communitytv.org/watch/government-demand/

    Their YouTube channel is here:

    https://www.youtube.com/playlist?list=PLOE8OGb8ohlInlNQMDD3KlX-UxSfAVCAy

    SC Metro Board agendas are here:

    https://scmtd.com/en/agency-info/board/board-agenda-archive

    SCCRTC meeting agendas are here:

    https://sccrtc.org/meetings/commission/agendas/

    And are archived here:

    https://sccrtc.org/meetings/commission/past-meetings/

    Advertise

    Copyright: © Creative Commons

    • Apple Podcasts
    • Google Play
    • Spotify

    Latest Episodes:
    12/04/25 SCCRTC P1 - Commissioner's Reports Dec 12, 2025
    Show notes

    Commissioner's Reports.

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/xwsBGsvKdl0?si=x-lMlYsxYT_XAmdw


    11/6/25 SCCRTC P7 - Right of Entry Agreement for the Murray Street Bridge Temporary Bicycle and Pedestrian Trail Nov 13, 2025
    Show notes

    The Commission approved a resolution authorizing Executive Director Christensen to execute a Right-of- Entry Agreement with the City of Santa Cruz for a temporary pedestrian and bicycle trail between Seabright Avenue and 7th Avenue, and to use adjacent areas of the Santa Cruz Branch Rail Line corridor for construction staging to support the Murray Street Bridge Seismic Retrofit and Barrier Replacement Project.

    The agreement is subject to approval by the RTC’s contracted railroad operator, Saint Paul & Pacific Railroad, a subsidiary of Progressive Rail, Inc.

    The Commission directed staff to continue facilitating reviews and approvals by Progressive Rail for both the temporary use of the railroad bridge and the staging area.

    This temporary trail will provide a vital connection for community members to businesses in the Seabright and Harbor neighborhoods during construction of the Murray Street Bridge Project, which has an estimated duration of two years.

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY


    11/6/25 SCCRTC P6 - Highway 1 Freedom Blvd to State Park Drive Auxiliary Lanes and Bus on Shoulder, and Coastal Rail Trail Segment 12 Project - Construction Implementation Strategy Options Nov 13, 2025
    Show notes

    The Commission received a presentation on two strategies for the implementation of the construction component of the Highway 1 Freedom Boulevard to State Park Drive Auxiliary Lanes and Bus on Shoulder, and Coastal Rail Trail Segment 12 Project. Final design and right of way is underway on the project which is scheduled to be construction-ready in fall 2026, and a decision is needed on which agency will serve as the implementing agency for the construction component of the project. Serving as the implementing agency for construction of the project entails advertising, awarding, and administering the construction contract.

    RTC staff and Caltrans developed two strategies for implementation of the project – a hybrid implementation by Caltrans (highway portion) and the RTC (rail trail portion), or have the RTC implement the entire project.

    The Commission approved the Caltrans/RTC hybrid implementation which would require splitting the project into two construction contracts. Staff has worked with Caltrans to develop a plan to split the two projects and will bring more information on the feasibility of the split to the Commission at a subsequent meeting for approval, as well as recommendations for entering into the needed Cooperative Agreements for the construction component, awarding and amending of construction management and design contracts to adopt plans, specifications, and engineer’s estimate for the project, and to add two additional staff to the RTC’s Capital Projects department.

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY


    11/6/25 SCCRTC P5 - Measure D Five-Year Programs of Projects for Regional Projects and Lift Line Nov 13, 2025
    Show notes

    The Commission received input from the public and approved the Fiscal Years (FY) 2025/26-2029/30 Measure D five-year programs of projects for regional projects funded by Measure D, and Community Bridges Lift Line projects. Measure D regional projects include Active Transportation/Rail Trail, Highway Corridors, Rail Corridor preservation, Highway 17 Wildlife Crossing, and San Lorenzo Valley-Highway 9 Corridor Improvements.

    The approved Measure D 5-year plan adds funding to projects previously approved in the plan and shifts funds between years to match project delivery schedules and project expenditure needs for a variety of projects in the Measure D Active Transportation, Highway and Rail categories.

    Some of the Measure D regional projects under construction currently and into the next year include Highway 1 Auxiliary Lanes and Bus-on-Shoulder between Bay/Porter and State Park, including a new bicycle/pedestrian overcrossing at Mar Vista Avenue, and Segment 5 of the Coastal Rail Trail from Wilder Ranch to Davenport on the Santa Cruz County North Coast. No new projects were programmed funds.

    Community Bridges Lift Line will continue to use its Measure D funds for three additional drivers, to support expanded weekday and weekend paratransit service, on vehicle operation costs, and on its new operations facility.

    The approved 5-year plans for spending Measure D funds are on the RTC website: www.sccrtc.org/move .

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY


    11/6/25 SCCRTC P4 - Adoption of the Consolidated Grants Program Nov 13, 2025
    Show notes

    Adoption of the Consolidated Grants Program and Regional Transportation Improvement Program

    Following consideration of public and advisory committee input, the Commission adopted the 2025 Consolidated Grants Program and the 2026 Regional Transportation Improvement Program (RTIP), approving road, bike, pedestrian and transit projects to receive the region’s anticipated formula share of certain state and federal funds totaling approximately $15 million. RTC staff used metrics to evaluate the projects that align with regional, state, and federal goals in the areas of access, safety, infrastructure condition, system performance and reliability, sustainability, resiliency, health, equity, and deliverability.

    Projects that received funding include:

    • Coastal Rail Trail Segments 8-9 and 10-11

    • Multimodal Projects on Soquel Drive, Freedom Blvd, and Bay Ave in Capitola

    • Santa Cruz METRO 90X express bus service between Santa Cruz and Watsonville using the new red

    bus-only shoulders on Highway 1

    • Pavement maintenance, roadway rehabilitation and traffic calming projects on local roads

    throughout the county

    • New and upgraded bike/pedestrian facilities projects in Capitola, Scotts Valley, and Watsonville

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY


    11/6/25 SCCRTC P3 - Caltrans Report Nov 13, 2025
    Show notes

    Caltrans Report

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY


    11/6/25 SCCRTC P2 - Director's Report Nov 13, 2025
    Show notes

    Director's Report

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY


    11/6/25 SCCRTC P1 - Commissioner's Reports Nov 13, 2025
    Show notes

    Meeting with California Transportation Commission

    Commissioners Fred Keeley, Manu Koenig, and Eduardo Montesino met with California Transportation Commissioner (CTC) Carl Guardino and staff from both agencies on October 20, 2025, regarding the Active Transportation Program (ATP) Cycle 6 grant award for the Coastal Rail Trail Segments 8 through 11 project.

    The meeting was held to discuss potential options for delivery of the Segments 8 through 11 project in light of significant construction cost escalation since the time of the original grant award. Commissioners inquired whether the RTC could retain the full Cycle 6 ATP grant amount while reducing the project scope to phase Segment 11 to a later date. Segment 11 represents approximately 2.5 miles of the total 6.7-mile project, and the CTC indicated that a one-third reduction in length is significant and would be unlikely to retain the full funding award. CTC staff said that they could still consider this request but would need to review a side-by-side comparison of project benefits between the original project scope and the proposed reduced-scope project. CTC staff confirmed that no additional ATP or other program funding is available to address the unprecedented cost escalation affecting transportation infrastructure projects statewide. CTC staff also expressed an openness to creative delivery approaches, such as an interim trail, that could achieve cost savings.

    RTC Documents are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    Original video is here:

    https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY


    10/2/25 SCCRTC P7 - Q&A part 2 Oct 08, 2025
    Show notes

    Q&A part 2 following Part 5 - Coastal Trail Project Delivery


    10/2/25 SCCRTC P6 - Q&A part 1 Oct 08, 2025
    Show notes

    Q&A - part 1 - Coastal Trail Project Delivery


    Previous 1 6 7 8 9 10 45 Next

    Related Podcasts

    Inside Strategic Coach: Connecting Entrepreneurs With What Really Matters

    1

    Inside Strategic Coach: Connecting Entrepreneurs With What Really Matters Business
    WSJ Your Money Briefing

    2

    WSJ Your Money Briefing Business
    FORTUNE Unfiltered with Aaron Task

    3

    FORTUNE Unfiltered with Aaron Task Business
    FORTUNE OnStage Presents: The Most Powerful Women

    4

    FORTUNE OnStage Presents: The Most Powerful Women Business
    Slate Money

    5

    Slate Money Business
    In The Dark – The New Yorker

    6

    In The Dark – The New Yorker Business News
    footer-logo

    Contact Us

    Toll Free: 844-670-7747

    Links

    • Home
    • Top Charts
    • Networks
    • Apps
    • Independents Podcasts
    • Podcast Advertising
    • Podcast News
    • Contact Us
    • About Us
    • Analytics & Insights

    Stay Connected

      Privacy, Terms of Use & Our Code of Ethics Protecting Content Creators Copyrights