TopPodcast.com
Menu
  • Home
  • Top Charts
  • Top Networks
  • Top Apps
  • Top Independents
  • Top Podfluencers
  • Top Picks
    • Top Business Podcasts
    • Top True Crime Podcasts
    • Top Finance Podcasts
    • Top Comedy Podcasts
    • Top Music Podcasts
    • Top Womens Podcasts
    • Top Kids Podcasts
    • Top Sports Podcasts
    • Top News Podcasts
    • Top Tech Podcasts
    • Top Crypto Podcasts
    • Top Entrepreneurial Podcasts
    • Top Fantasy Sports Podcasts
    • Top Political Podcasts
    • Top Science Podcasts
    • Top Self Help Podcasts
    • Top Sports Betting Podcasts
    • Top Stocks Podcasts
  • Podcast News
  • About Us
  • Podcast Advertising
  • Contact
Not in our directory?
Add Show Here
Podcast Equipment
Center

toppodcastlogoOur TOPPODCAST Picks

  • Comedy
  • Crypto
  • Sports
  • News
  • Politics
  • True Crime
  • Business
  • Finance

Follow Us

toppodcastlogoStay Connected

    View Top 200 Chart
    Back to Rankings Page
    Government

    Santa Cruz County Transit and Transportation Agency Meetings – Audio Tracks

    Attending these meetings in person is very time consuming. They are long and there is often quite a bit of administrative business done. Not many people have the time to do it. And, even if you do, it is not a very efficient use of time.

    But the meetings are important. They are the best way to keep track of what the agencies are up to. These podcasts make access to that content very simple and efficient.

    I edit the podcasts to break the meetings into short, topical episodes. You can listen to the episodes that cover topics that matter to you. The cool thing about doing that with a podcast is that you can listen whenever and wherever you can.

    The podcasts are made from community tv.org ‘s video feed of the meetings. Thanks go to them for providing those. You can see the full videos on their website.

    I’ve started adding some episodes that cover the supporting documents for the meetings. Those can be very useful. I am using text to audio conversions to convert them to an audio format.

    I’m not editing the content of the podcasts. It is extracted directly from the video of the meetings. I am editing out the agency’s administrative business, and I am not including public comments. Both of those are available in the original video.

    There are some presentations that depend on a Power point presentation or slides. I make videos of those and post them on YouTube.

    Community Television of Santa Cruz County (CTV) videos of local agency meetings are here:

    https://communitytv.org/watch/government-demand/

    Their YouTube channel is here:

    https://www.youtube.com/playlist?list=PLOE8OGb8ohlInlNQMDD3KlX-UxSfAVCAy

    SC Metro Board agendas are here:

    https://scmtd.com/en/agency-info/board/board-agenda-archive

    SCCRTC meeting agendas are here:

    https://sccrtc.org/meetings/commission/agendas/

    And are archived here:

    https://sccrtc.org/meetings/commission/past-meetings/

    Advertise

    Copyright: © Creative Commons

    • Apple Podcasts
    • Google Play
    • Spotify

    Latest Episodes:
    9/4/25 SCCRTC P5 - Caltrans Report Sep 08, 2025
    Show notes

    Caltrans Report


    9/4/25 SCCRTC P4 - Director’s Report Continued Sep 08, 2025
    Show notes

    9/4/25 SCCRTC P4 - Director’s Report Continued Summary

    Action Items

    Speaker C Clarify Segment Eight Timeline Confirm and communicate that segment eight construction will start late 2026 and complete by spring 2027.

    Speaker A Highlight Community Investments Ensure all projects clearly communicate the investment from Measure D to the community to support future funding efforts.

    Funding and Community Investment

    • Speaker A thanks voters for Measure D and highlights $125 million invested plus $350 million in matching grants.
    • Emphasizes the importance of showcasing community investments for future funding efforts.
    • Notes the need to communicate where money has been spent to support future sales tax measures.

    Project Segments and Timeline

    • Speaker B seeks clarification on microphone system and project timelines.
    • Segment eight is possible to be done in 2026; segment nine is not due to financial constraints.
    • Speaker C clarifies segment eight construction would start late 2026 and complete by spring 2027.
    • Speaker B confirms understanding that construction starts in 2026 but finishes in 2027.

    Next Steps and Meeting Conduct

    • Speaker A acknowledges the information and moves the meeting forward.
    • Participants express appreciation for staff reports and follow-ups on expediting segments and emergency funding.
    • Speaker B humorously notes learning the microphone system rules that only one person can speak at a time.

    9/4/25 SCCRTC P3 - Director’s Report Sep 08, 2025
    Show notes

    Overview

    • $125 million spent on local transportation projects since Measure D inception through June 2024.
    • $350 million in outside grants secured using Measure D as leverage.
    • Zero Emission Passenger Rail & Trail Project community outreach completed; final report expected by October.
    • Temporary pedestrian/bike path over Murray Street Bridge: $1.7 million cost, funding being sought after CTC denial.
    • Staffing update: Nisha Singh appointed Director of Internal Services.

    Measure D Annual Report and Financial Overview

    • Measure D annual report for FY 2024 available on RTC website (item 14, consent agenda).
    • From inception to June 2024, nearly $125 million spent on local roads, transit, paratransit, highway improvements, rail preservation, and coastal rail trail.
    • Volunteer Taxpayer Oversight Committee reviewed audits and confirmed expenditures align with ordinance and expenditure plan.
    • Measure D used as leverage to secure over $350 million in outside grants for regional projects through FY 2024.
    • Expenditure plan lists projects exceeding tax revenue, intending to maximize local funds via grant matching.

    Zero Emission Passenger Rail & Trail Project Outreach and Next Steps

    • Community outreach for Zero Emission Passenger Rail and Trail Project conducted June 12–August 22.
    • Outreach included virtual open house, nine office hours (virtual/in-person), informational session, partner meetings, and event tabling.
    • Draft project concept report summarizes community input from Milestone 4.
    • Next steps: compile feedback, prepare full cost estimate, address commission requests from August 7, finalize concept report.
    • Final project concept report to be shared with community upon completion.

    Murray Street Bridge Temporary Path: Options, Costs, and City Decisions

    • City Council approved temporary pedestrian/bike path on RTC-owned rail bridge (Aug 26).
    • Four options studied; selected 3,000-foot, 8-foot-wide compacted base rock path as most viable.
    • Estimated cost: $1.7 million for installation and removal.
    • Next steps: develop engineered plans, ensure regulatory compliance, seek RTC and railroad operator approval.
    • City will not proceed with temporary rail shuttle due to higher costs and funding constraints.

    Coastal Rail Trail Segments 8 & 9 Status and Funding Challenges

    • Consulted with City of Santa Cruz staff on Rail Trail Segments 8 and 9 timeline.
    • Project is at start of final design phase; lacks sufficient design funding.
    • Final design, right-of-way, and environmental permitting require significant time.
    • Completion by end of 2026 is not feasible.

    Staffing Updates and TDM Conference Participation

    • Nisha Singh appointed Director of Internal Services; over 16 years public sector experience.
    • Nisha previously served as finance manager for City of Los Altos; led financial operations, budgeting, reporting.
    • Holds MBA and BBA in finance; expertise in public budgeting, audits, payroll, financial reporting, enterprise systems.
    • Sierra Topp to attend Transportation Demand Management Conference in Portland, Oregon, October.
    • Topp manages TDM programs: Cruise 511, Go Santa Cruz County, Go Bike.

    9/4/25 SCCRTC P2 - Commissioner Reports Sep 08, 2025
    Show notes

    9/4/25 SCCRTC P2 - Commissioner Reports Summary

    Overview

    • Commissioner Jillian Ritter introduced as new First District RTC alternate.
    • Ad hoc committee continues work on encroachments and easements along Santa Cruz Branch Trail.
    • Updates on regional rail and transportation projects, including hydrogen train demonstration.
    • Support and flexibility for Capitola event logistics highlighted as economic boost.
    • Proclamations and activities planned for 'Week Without Driving' to promote mobility equity.

    Commissioner Ritter's Introduction and Background

    • Jillian Ritter introduced as first district alternate to RTC, appointed June.
    • Joined Supervisor Koenig's office as staff in May.
    • Lifelong District 1 resident, Santa Cruz County.
    • Worked with Board of Supervisors (2016–2022) and various county departments, including Parks Department during rail trail project transition.

    Ad Hoc Committee on Trail Encroachments and Easements

    • Ad hoc committee for Santa Cruz Branch Trail encroachments/easements held second meeting on August 25.
    • Committee continues to gather information and assess relief/mitigation options for mobile homeowners.

    Regional Rail and Hydrogen Train Updates

    • Attended Coastal Rail Coordinating Council in Los Angeles; discussed infrastructure planning for Olympics.
    • Observed South County rail projects.
    • Visited San Bernardino to inspect proposed hydrogen train for Santa Cruz.
    • Interacted with engineers and toured train maintenance facility.
    • Collaborated with colleagues from Monterey, San Luis Obispo, and Santa Barbara counties.

    Event Coordination for Capitola Art & Wine Festival

    • Expressed gratitude to Executive Director Sarah Christensen, Commissioner Manne Koenig, and Kim Serfer for support with Bay and Porter ramp closures in Capitola.
    • Acknowledged flexibility in closure timing due to upcoming Art and Wine Festival, which provides significant economic benefit to the community.

    'Week Without Driving' Proclamations and Mobility Equity

    • Week Without Driving scheduled for late September to early October.
    • RTC, Santa Cruz Metro, Community Traffic Safety Coalition, and County Office of Transportation participate with events and activities.
    • Key events: Hazard Report webinar (Sept 29), Countywide Celebration at Capitola Mall (Sept 30), RTC Challenge contest (week-long), Route 78 ride in Watsonville (Oct 1).
    • County and local city proclamations planned; commissioners and staff participating.
    • Initiative emphasizes mobility access, public health, and understanding non-driver transportation challenges.

    9/4/25 SCCRTC P1 - Consent Agenda Sep 08, 2025
    Show notes

    9/4/25 SCCRTC P1 - Consent Agenda Summary

    Action Items

    Speaker A Move motion to amend subsidy policy Move to amend the consent agenda to include direction that future subsidies only support e-bikes pedal assisted up to 20 mph, excluding faster models.

    Speaker C Second motion to amend subsidy policy Second the motion to limit subsidies to e-bikes with max 20 mph pedal assist, pending public input.

    Concerns Raised

    • Commissioner Schiffrin expressed concern about subsidizing e-bikes that can go 28 mph, which he thinks is "too fast."
    • Safety issues with faster e-bikes, especially involving children and teenagers, have increased significantly, with accidents up 300% in two years.

    Policy Proposal

    • Recommendation to change subsidy policy to only support e-bikes that pedal assist up to 20 mph.
    • No subsidies for e-bikes exceeding 20 mph or with throttles.

    State Pilot Influence

    • Marin County state pilot program is being closely followed due to safety complaints.
    • Current state law prohibits local action until pilot concludes.

    Commission Discussion

    • Staff confirmed it is feasible to limit subsidies without passing new laws, as subsidy program is discretionary.
    • Commissioners agreed to bring the proposal to the public for input before making a motion.
    • Motion to amend consent agenda with new subsidy direction was moved and seconded.

    8/26/25 SC City Council P4 - Murray Street Bridge Project Update - More comments and Q&A Aug 30, 2025
    Show notes

    Update on Actions to Support Seabright and Harbor Businesses Affected by the Murray Street Bridge Project - More comments and questions

    The full agenda and video is here:

    https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&documentType=AgendaPacket&itemId=0&publishId=0&isSection=false

    https://www.youtube.com/watch?v=Z9Rev9E2ndk&list=PLo9N9AsVOVvRHxhItEBaP3eI7Rmz8ywBT


    8/26/25 SC City Council P3 - Murray Street Bridge Project Update - Q&A Aug 30, 2025
    Show notes

    Update on Actions to Support Seabright and Harbor Businesses Affected by the Murray Street Bridge Project - Staff Presentation

    The full agenda and video is here:

    https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&documentType=AgendaPacket&itemId=0&publishId=0&isSection=false

    https://www.youtube.com/watch?v=Z9Rev9E2ndk&list=PLo9N9AsVOVvRHxhItEBaP3eI7Rmz8ywBT


    8/26/25 SC City Council P2 - Update on Support for Businesses Affected by the Murray Street Bridge Project - Staff Presentation Aug 30, 2025
    Show notes

    Update on Actions to Support Seabright and Harbor Businesses Affected by the Murray Street Bridge Project - Staff Presentation

    There's a video of the presentation here:

    https://youtu.be/ZxiG18ps2tE

    The full agenda and video is here:

    https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&documentType=AgendaPacket&itemId=0&publishId=0&isSection=false

    https://www.youtube.com/watch?v=Z9Rev9E2ndk&list=PLo9N9AsVOVvRHxhItEBaP3eI7Rmz8ywBT


    8/26/25 SC City Council P1 - Transportation and Parking Challenges Aug 30, 2025
    Show notes

    Transportation and Parking Challenges near transit development projects

    The full agenda and video is here:

    https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&documentType=AgendaPacket&itemId=0&publishId=0&isSection=false

    https://www.youtube.com/watch?v=Z9Rev9E2ndk&list=PLo9N9AsVOVvRHxhItEBaP3eI7Rmz8ywBT


    8/7/25 SCCRTC P8 - Murray St Bridge Aug 29, 2025
    Show notes

    Special meeting called to discuss the consequences of the construction for the local businesses and some possible mitigation plans.

    The full agenda and highlights are here:

    https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/

    The video from Community TV is here:

    https://www.youtube.com/playlist?list=PLo9N9AsVOVvRZ52uJW8KW1xLX7iizMk85


    Previous 1 8 9 10 11 12 45 Next

    Related Podcasts

    Inside Strategic Coach: Connecting Entrepreneurs With What Really Matters

    1

    Inside Strategic Coach: Connecting Entrepreneurs With What Really Matters Business
    WSJ Your Money Briefing

    2

    WSJ Your Money Briefing Business
    FORTUNE Unfiltered with Aaron Task

    3

    FORTUNE Unfiltered with Aaron Task Business
    FORTUNE OnStage Presents: The Most Powerful Women

    4

    FORTUNE OnStage Presents: The Most Powerful Women Business
    Slate Money

    5

    Slate Money Business
    In The Dark – The New Yorker

    6

    In The Dark – The New Yorker Business News
    footer-logo

    Contact Us

    Toll Free: 844-670-7747

    Links

    • Home
    • Top Charts
    • Networks
    • Apps
    • Independents Podcasts
    • Podcast Advertising
    • Podcast News
    • Contact Us
    • About Us
    • Analytics & Insights

    Stay Connected

      Privacy, Terms of Use & Our Code of Ethics Protecting Content Creators Copyrights